-
Task
-
Resolution: Done
-
Major
-
None
-
None
-
None
Based on the analysis document write the test plan for swatch-utilization.
Acceptance Criteria:
- the test plan is presented to the team
- the test plan on the repository alongside application code
- schedule a doc review meeting with lightning team for approval
- causes
-
SWATCH-4416 Swatch-Utilization: Test overage detection logic
-
- New
-
-
SWATCH-4417 Swatch-Utilization: Test multi-resource processing
-
- New
-
-
SWATCH-4418 Swatch-Utilization: Test capacity handling
-
- New
-
-
SWATCH-4419 Swatch-Utilization: Test configuration
-
- New
-
- split from
-
SWATCH-3797 Write IQE tests to verify the end to end functionality
-
- Closed
-
- links to
(1 links to)