-
Story
-
Resolution: Done
-
Minor
-
RH134 - RHEL9.0-en-3-20220914
-
None
-
2
-
ROLE
-
en-US (English)
URL: https://rol.redhat.com/rol/app/courses/rh134-9.0/pages/ch02s04
Reporter RHNID: yuvaraj-rhls
Section: scheduling-cron-ge - Guided Exercise: Schedule Recurring User Jobs
Language: en-US (English)||||||||
Workaround:
Description: Description: Sorry to be a stickler but the addition of the important not in Q2 for ch02s04 isn't quite enough in my opinion: I was doing the exercise within the specified days. And the following instruction doesn't make sense to me - does adjusting the system date and time meaning finding a time zone so it looks like I am between a Monday-Friday? Is that always possible? Maybe a better text would be something like 'If you are working on this exercise outside the specified days in the preceding instruction, or in a different timezone to `servera`, then you may need to pick a different 5 day range to ensure the job will run while you are working.'.
- duplicates
-
PTL-5875 RH134-578: Feedback -- That task should probably be altered to better accommodate people doing the course from a different timezone.
- Closed