Uploaded image for project: 'Product Technical Learning'
  1. Product Technical Learning
  2. PTL-5458

DO447-36: lab developement-practices start needs adjustment

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Major Major
    • DO447 - RHAE2.8 1 20190626
    • DO447
    • None
    • ILT, ROLE, VT
    • en-US (English)

      URL:
      Reporter RHNID:
      Section: -
      Language: en-US (English)
      Workaround:

      Description: In DO447-RHAE2.8-en-1-20190626, GE IMPLEMENTING RECOMMENDED
      PRACTICES (page 8) starts with the lab script:

      [student@workstation ~]$ lab development-practices start

      It starts the install of IdM on utility VM. Only, it seems to think that part succeeded even if utility VM is not reachable.

      Output with utility VM off:Setting up workstation for the Guided Exercise: Implementing Recommended Practices

      Preparing the environment:

       · Ensuring utility.lab.example.com is reachable...............  FAIL
       · Ensuring IdM is installed...................................  SUCCESS
       · Setting up labs folder......................................  SUCCESS
       · Downloading starter project.................................  SUCCESS
       · Setting up solutions folder.................................  SUCCESS
       · Downloading solution project................................  SUCCESS

      Setup successful. Please proceed with the exercise.

       

       

      We experienced this issue at the pilot in Bangkok as well. It leaves utility without IdM setup and we have to troubleshoot later on.

              rht-sbonnevi Steven Bonneville
              nandan-ltc-gls-in Nandan Bhat (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: