-
Story
-
Resolution: Done
-
Critical
-
None
-
None
-
Future Sustainability
-
False
-
-
False
-
1
-
None
-
Veritas OLM Sprint 256, Wolverine OLM Sprint 257
this is a downstream tracker for work already merged upstream (linked to this issue).
To downstream this work, we must
cut a catalogd upstream release which contains the feature
create/merge operator-controller upstream PR which bumps the version of catalogd to the desired release