-
Task
-
Resolution: Done
-
Critical
-
ACM 2.11.0
-
8
-
False
-
None
-
False
-
-
-
QE Sprint 2024-12
-
No
Working with Dev Douglas to set up the load balance proxy, and configuration on the Observability to verify the alertmanager working in TLS passthrough.
The detailed steps are in https://docs.google.com/document/d/1uSC2g70fmETkdrRiP32oz0awPJ8bfVMqMoEer-YLOk0/edit
This task focus on issue https://issues.redhat.com/browse/ACM-11722 verification, it through several sprints. This task is used to track work load and related information.
- is depended on by
-
ACM-10706 Ensure ACM Obs in managed cluster can talk to hub through vip/reverse proxy/lb
- Closed