Uploaded image for project: 'WildFly Core'
  1. WildFly Core
  2. WFCORE-3965

Cover possible error when host controllers can not connect to domain after creating a rollout plan and restarting the master host controller

    Details

    • Type: Bug
    • Status: Resolved (View Workflow)
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: 6.0.0.Alpha5
    • Component/s: None
    • Labels:
      None

      Description

      On downstream (6.4.x) there is an error https://bugzilla.redhat.com/show_bug.cgi?id=1599625 about error during restart of master host with rollout plan. This problem doesn't happen on master, but both fix and test should to be created also for wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test).

      Original problem:
      Creating a rollout plan and restarting the dc host prevent the other hosts to connect to the master again. The slave hc is unable to connect giving the error JBAS014687: Resource is immutable, the dc shows many errors like:

      JBAS012119: cancelled task by interrupting thread Thread[Host Controller Service Threads - 117,5,Host Controller Service Threads]

        Gliffy Diagrams

          Attachments

            Issue Links

              Activity

                People

                • Assignee:
                  jondruse Jiri Ondrusek
                  Reporter:
                  jondruse Jiri Ondrusek
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  2 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved: