Uploaded image for project: 'JBoss Enterprise Application Platform'
  1. JBoss Enterprise Application Platform
  2. JBEAP-15066

(7.4.z) Cover possible error when host controllers can not connect to domain after creating a rollout plan and restarting the master host controller

    XMLWordPrintable

Details

    Description

      On downstream (6.4.x) there is an error - https://bugzilla.redhat.com/show_bug.cgi?id=1599625 - about error during restart of master host with rollout plan. This problem doesn't happen on 7.1.x, but both fix and test should to be created for 7.1.x (to satisfy upstream and prevent similar problems to happen - by introducing a test).
      Original problem:
      Creating a rollout plan and restarting the dc host prevent the other hosts to connect to the master again. The slave hc is unable to connect giving the error JBAS014687: Resource is immutable, the dc shows many errors like:
      JBAS012119: cancelled task by interrupting thread Thread[Host Controller Service Threads - 117,5,Host Controller Service Threads]

      Attachments

        Issue Links

          Activity

            People

              jondruse@redhat.com Jiri Ondrusek
              jondruse@redhat.com Jiri Ondrusek
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: