Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-9278

Update release-draft pipeline to work with OCI(Oracle Cloud) by downloading the manifests

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Unresolved
    • Icon: Major Major
    • None
    • None
    • Process Improvements
    • None

      Story (Required)

      While doing release with OCI during draft release the `release-draft` pipeline is using gcs-download taskĀ 

      But for OCI to work we need to have a task compatible to OCI

      As part of this story

      • release-draft pipeline should work for OCI
      • If require add new task `oci-download` to download the release yamls

      Background (Required)

      <Describes the context or background related to this story>

      Out of scope

      <Defines what is not included in this story>

      Approach (Required)

      <Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Mandatory)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

              rh-ee-anataraj Anitha Natarajan
              sashture Savita .
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated: