Pruner development tasks

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Done
    • Icon: Critical Critical
    • Pipelines 1.19.0
    • None
    • Pruner
    • None
    • 8
    • Pipelines Sprint Pioneers 25, Pipelines Sprint Pioneers 26, Pipelines Sprint Pioneers 27, Pipelines Sprint Pioneers 28, Pipelines Sprint Pioneers 29

      Story (Required)

      Complete the rest of pending development activities

      Background (Required)

      We progressed to refactor pruner code as part of  https://issues.redhat.com/browse/SRVKP-7104.

      With the MVP version completed with the above JIRA, the following items have to completed to make it robust

      1. Complete Code Review incrementally and Merge to main branch. Would prefer to team up with 1 or 2 reviewers based on availability and accomplish this. (As a back up we have the original version done by Jeeva maintained in https://github.com/openshift-pipelines/tektoncd-pruner/tree/design-iteration-1)
      2. Incorporate README & unit tests (unit tests will be added with every incremental commit)
      3. Include documentation (with working examples and varying config options) - This as well can be done incrementally
      4. Release a  minimal version of pruner to accomodate this in Operator

      Out of scope

      Code changes to address Watching and handling pruning behavior based on namespace level configmap is out of scope of this story.

      Approach (Required)

      •  

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Mandatory)

      Are the PipelineRuns and TaskRuns pruned succesfully based on the configmap settings?

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Acceptance criteria are met

              rh-ee-anataraj Anitha Natarajan
              rh-ee-anataraj Anitha Natarajan
              Sri Vignesh Selvan Sri Vignesh Selvan
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved:

                  Estimated:
                  Original Estimate - 13 minutes
                  13m
                  Remaining:
                  Remaining Estimate - 13 minutes
                  13m
                  Logged:
                  Time Spent - Not Specified
                  Not Specified