-
Bug
-
Resolution: Won't Do
-
Normal
-
None
-
None
-
False
-
-
False
-
-
Description of problem:
- A PR is sent.
- The PLR cannot be instanciated for some reason (e.g. quota restriction).
- GH will display the Pipeline as failed, without any PLR name.
- The quota issue is fixed.
- An update to the PR is sent.
- The PLR run successfully.
- GH will display the Pipeline as failed. When opening the pipeline, 2 tasks are shown. The initial failed pipeline and the new successful pipeline (see attached screenshots).
Workaround
- User needs to access the details of the failed pipeline to check the status.
Prerequisites (if any, like setup, operators/versions):
- OSP 1.11.0
Steps to Reproduce
# See description
Actual results:
Expected results:
Reproducibility (Always/Intermittent/Only Once):
Acceptance criteria:
Definition of Done:
Build Details:
Additional info (Such as Logs, Screenshots, etc):