Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-3379

[PaC][UX] Inconsistent Pipeline status after a failure

XMLWordPrintable

    • False
    • Hide

      None

      Show
      None
    • False

      Description of problem:

      • A PR is sent.
      • The PLR cannot be instanciated for some reason (e.g. quota restriction).
      • GH will display the Pipeline as failed, without any PLR name.
      • The quota issue is fixed.
      • An update to the PR is sent.
      • The PLR run successfully.
      • GH will display the Pipeline as failed. When opening the pipeline, 2 tasks are shown. The initial failed pipeline and the new successful pipeline (see attached screenshots).

      Workaround

      • User needs to access the details of the failed pipeline to check the status.

      Prerequisites (if any, like setup, operators/versions):

      • OSP 1.11.0

      Steps to Reproduce

       # See description

       

      Actual results:

      Expected results:

      Reproducibility (Always/Intermittent/Only Once):

      Acceptance criteria: 

       

      Definition of Done:

      Build Details:

      Additional info (Such as Logs, Screenshots, etc):

       

       *

        1. Screenshot from 2023-08-04 10-08-27.png
          53 kB
          Romain Arnaud
        2. Screenshot from 2023-08-04 10-06-20.png
          83 kB
          Romain Arnaud
        3. Screenshot from 2023-08-04 10-09-35.png
          105 kB
          Romain Arnaud

              sashture Savita .
              rarnaud@redhat.com Romain Arnaud
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: