-
Epic
-
Resolution: Unresolved
-
Normal
-
None
-
Handle workload pod eviction in multiple scenarios
-
False
-
None
-
False
-
To Do
-
-
customers have noticed taskrun pods getting evicted in event of:
- node drain and cluster upgrades
- the risk here is that if a workload pod is evicted mid-cycle and scheduled on another node, then the nature of the task/pipeline can be such that it might be detrimental to run it again (read, one-time configuration, backups, deletion, infra configuration, etc)
we need to figure out how to handle these cases gracefully
Customer:
Ford
- incorporates
-
SRVKP-2357 TaskRun pod get evicted during a Graceful Termination event, such as a node drain
- To Do
- relates to
-
SRVKP-3137 Handle downtime and workload execution during product upgrades
- New