Stunner designer ignores 'jbpm.enable.multi.con=true'

XMLWordPrintable

    • Icon: Enhancement Enhancement
    • Resolution: Duplicate
    • Icon: Major Major
    • None
    • 7.6.0.GA
    • jBPM Designer
    • OpenJDK 11

      The Stunner designer does not allow multi connections going in/out activity nodes.

      It is not possible to create a process like the one in the attachment. Screen Shot 2020-01-27 at 5.12.55 PM.png. Note the screenshot is taken from the Old designer.

      Steps to reproduce

      1. Start the Business Central server with -Djbpm.enable.multi.con=true
      2. Create any activity (e.g. User task).
      3. Append any node except Text Annotation to this task (using quick toolbox menu).
      4. Try to append one more node to this task (not Text Annotation).

      Actual result

      It is not possible to do that.

      Expected result

      It is possible to do that.

      Acceptance criteria

      It is possible to create more than one outgoing or incoming sequence flows from any activity, event (except the end events) and gateways.

        1. events-outcoming.png
          88 kB
          Alessandro Lazarotti
        2. Screen Shot 2020-01-27 at 5.12.55 PM.png
          259 kB
          Rafael Soares
        3. task-incoming.png
          92 kB
          Alessandro Lazarotti

            handreyrc Handrey Cunha
            rafael.soares Rafael Soares
            Lubomir Terifaj Lubomir Terifaj
            Lubomir Terifaj Lubomir Terifaj
            Votes:
            0 Vote for this issue
            Watchers:
            7 Start watching this issue

              Created:
              Updated:
              Resolved: