Stunner designer ignores 'jbpm.enable.multi.con=true'

    XMLWordPrintable

Details

    • Enhancement
    • Resolution: Duplicate
    • Major
    • None
    • 7.6.0.GA
    • jBPM Designer
    • OpenJDK 11

    Description

      The Stunner designer does not allow multi connections going in/out activity nodes.

      It is not possible to create a process like the one in the attachment. Screen Shot 2020-01-27 at 5.12.55 PM.png. Note the screenshot is taken from the Old designer.

      Steps to reproduce

      1. Start the Business Central server with -Djbpm.enable.multi.con=true
      2. Create any activity (e.g. User task).
      3. Append any node except Text Annotation to this task (using quick toolbox menu).
      4. Try to append one more node to this task (not Text Annotation).

      Actual result

      It is not possible to do that.

      Expected result

      It is possible to do that.

      Acceptance criteria

      It is possible to create more than one outgoing or incoming sequence flows from any activity, event (except the end events) and gateways.

      Attachments

        Issue Links

          Activity

            People

              handreyrc Handrey Cunha
              rafael.soares Rafael Soares
              Lubomir Terifaj Lubomir Terifaj
              Lubomir Terifaj Lubomir Terifaj
              Votes:
              0 Vote for this issue
              Watchers:
              7 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: