Feature Overview
Data plane adoption for RHOSO provides mechanism to upgrade in-place the openstack deployment from RHOSP 17.1 to RHOSO 18 by deploying a parallel control plane based on RHOSO 18 and then pointing the compute nodes to the new control plane.
BGP in RHOSP 17.1 supports L3 HA for the OpenStack control plane and enables customers to deploy Openstack control plane across L3 boundaries. This feature is to test the RHOSO adoption process for BGP control plane as the user transitions from RHOSP 17.1 to RHOSO 18 using the adoption process.
Goals
Validate and automate the testing for data plane adoption of BGP control plane.
Release note for new feature capability
Requirements (mandatory -_ Complete while in Refinement status):
A list of specific needs, capabilities, or objectives that a Feature must deliver to satisfy the Feature. Some requirements will be flagged as MVP. If an MVP gets shifted, the Feature shifts. If a non MVP requirement slips, it does not shift the feature.
| Requirement | Notes | isMVP? |
|---|---|---|
Acceptance Criteria
- Validate and automate the testing for data plane adoption of BGP control plane.
- Have Routed spine & leaf3 controller nodes using BGP for reachability information (i.e host routes)
- Perform Adoption from 17.1 to FR3 RHOSO 18.0
- Verify all controller nodes are able to reach each other using BGP reachbility information
- Verify FRR config/logs dont report any abnormality
- Release note for technology preview capability (no documentation update until full support)
Team Sign Off (Completion while in Planning status)
- All required Epics (known at the time) are linked to the this Feature
- All required Stories, Tasks (known at the time) for the most immediate Epics have been created and estimated
- Add - Reviewers name, Team Name
- Acceptance == Feature as “Ready” - well understood and scope is clear - Acceptance Criteria (scope) is elaborated, well defined, and understood
- Note: Only set FixVersion/s: on a Feature if the delivery team agrees they have the capacity and have committed that capability for that milestone
| Reviewed By | Team Name | Accepted | Notes |
- …
- is depended on by
-
OSPRH-18966 Doc: Research the doc impacts of BGP data plane support
-
- Closed
-