• Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Major Major
    • None
    • None
    • None
    • Overlay workflow improvements
    • S
    • False
    • Hide

      None

      Show
      None
    • False
    • RHDHPLAN-309Overlay repository enhancements and continuous maintenance
    • To Do
    • RHDHPLAN-309 - Overlay repository enhancements and continuous maintenance
    • QE Needed, Docs Needed, TE Needed, Customer Facing, PX Needed
    • 33% To Do, 0% In Progress, 67% Done

      EPIC Goal

      Improve the workflows in overlay repo - testing, updating. 

      Smoke tests

      • The current status of the smoke tests in relation to the e2e plugin tests should be discussed:
      Scope of the tests
      • currently only checking for successful plugin loading messages within install container logs.
      • errors caused by missing configuration are ignored - no check for missing appconfig section
      • checking of basic UI components loading already covered by plugin e2e tests
      • smoke tests could be passed if ran the e2e on the pr

      Why is this important?

      User Scenarios

      Dependencies (internal and external)

      Acceptance Criteria

      Release Enablement/Demo - Provide necessary release enablement details
      and documents

      DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
      Issue>

      DEV - Upstream documentation merged: <link to meaningful PR or GitHub
      Issue>

      DEV - Downstream build attached to advisory: <link to errata>

      QE - Test plans in Playwright: <link or reference to playwright>

      QE - Automated tests merged: <link or reference to automated tests>

      DOC - Downstream documentation merged: <link to meaningful PR>

              rh-ee-rlan Rostislav Lan
              rh-ee-rlan Rostislav Lan
              RHDH Plugins
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated: