Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-808

BPM cluster fails to initialize properly due to ConcurrentRefUpdateException thrown by jgit

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Critical Critical
    • 6.2.0
    • 6.1.0
    • Business Central
    • None

      Description of problem:
      Having a BPM cluster with two EAP 6.4 nodes in a domain, sometimes the second cluster node fails to deploy business central properly due to org.eclipse.jgit.api.errors.ConcurrentRefUpdateException: Could not lock HEAD. RefUpdate return code was: LOCK_FAILURE. Please take a look at attached server logs.

      In Majority of attempts the issue does not occur, it's likely a synchronization problem. The first node seems to be working and responsive, the second node is completely lost when the issue happens.

      Version-Release number of selected component (if applicable):
      6.1.0.ER5

      How reproducible:
      10% - 20%

      Steps to Reproduce:
      1. configure two EAP 6.4 nodes in domain mode together with helix and zookeeper
      2. deploy business central
      3. watch for errors in server logs

        1. server log excerpt CR1.txt
          36 kB
          Radovan Synek
        2. server log excerpt ER6.txt
          37 kB
          Radovan Synek
        3. server log node one.txt
          1.31 MB
          Radovan Synek
        4. server log node two.txt
          370 kB
          Radovan Synek

              abakos@redhat.com Alexandre Porcelli
              rsynek@redhat.com Radovan Synek (Inactive)
              Radovan Synek Radovan Synek (Inactive)
              Radovan Synek Radovan Synek (Inactive)
              Kris Verlaenen, Radovan Synek (Inactive), Rajesh Rajasekaran
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: