Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-808

BPM cluster fails to initialize properly due to ConcurrentRefUpdateException thrown by jgit

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Critical Critical
    • 6.2.0
    • 6.1.0
    • Business Central
    • None

      Description of problem:
      Having a BPM cluster with two EAP 6.4 nodes in a domain, sometimes the second cluster node fails to deploy business central properly due to org.eclipse.jgit.api.errors.ConcurrentRefUpdateException: Could not lock HEAD. RefUpdate return code was: LOCK_FAILURE. Please take a look at attached server logs.

      In Majority of attempts the issue does not occur, it's likely a synchronization problem. The first node seems to be working and responsive, the second node is completely lost when the issue happens.

      Version-Release number of selected component (if applicable):
      6.1.0.ER5

      How reproducible:
      10% - 20%

      Steps to Reproduce:
      1. configure two EAP 6.4 nodes in domain mode together with helix and zookeeper
      2. deploy business central
      3. watch for errors in server logs

        1. server log excerpt CR1.txt
          36 kB
        2. server log excerpt ER6.txt
          37 kB
        3. server log node one.txt
          1.31 MB
        4. server log node two.txt
          370 kB

            abakos@redhat.com Alexandre Bakos
            rsynek@redhat.com Radovan Synek
            Radovan Synek Radovan Synek
            Radovan Synek Radovan Synek
            Kris Verlaenen, Radovan Synek, Rajesh Rajasekaran
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: