Uploaded image for project: 'Product Technical Learning'
  1. Product Technical Learning
  2. PTL-9597

DO480-75: Fresh lab fails to start at ch09s01

XMLWordPrintable

    • 9
    • en-US (English)

      URL:
      Reporter RHNID:
      Section: -
      Language: en-US (English)
      Workaround:

      Description: The lab was running in an OSP datacenter which needed to be reinstalled. New labs were provisioned in EMEA and we need to start at ch09s01 and it fails on running lab start operate-integrate

      There are different errors on subsequent runs of the command.

        1. Screenshot 2023-06-09 at 8.49.19 AM.png
          Screenshot 2023-06-09 at 8.49.19 AM.png
          720 kB
        2. Screenshot 2023-06-09 at 8.46.57 AM.png
          Screenshot 2023-06-09 at 8.46.57 AM.png
          475 kB
        3. operate-integrate.png
          operate-integrate.png
          67 kB
        4. image-2023-06-09-14-31-56-016.png
          image-2023-06-09-14-31-56-016.png
          50 kB
        5. image (1).png
          image (1).png
          99 kB
        6. image.png
          image.png
          100 kB

              gls-curriculum-ocp-core@redhat.com PTL - OCP Platform Team
              ricardodacosta Ricardo da Costa (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: