-
Story
-
Resolution: Done
-
Normal
-
None
-
rhos-18.0 FR 1 (Nov 2024)
-
None
We need to validate that the proposed documentation(currently as a draft PR in OSPRH-11301 is accurate.
We also need to evaluate if we need additonal CI job (and if yes, then create it) which will test adoption procedure in the scenario when OSP-17.1's controller nodes, which were gateway chassis are kept as networker nodes after the adoption is finished.
- is related to
-
OSPRH-11301 Dataplane adoption procedure to adopt controller nodes as networkers is missing
-
- Closed
-
- links to
- mentioned in
-
Page Loading...