-
Story
-
Resolution: Done
-
Critical
-
None
-
None
-
None
-
2
-
False
-
-
False
-
Not Selected
-
rhos-connectivity-neutron
-
-
-
-
Neutron Quark 2
-
1
-
Critical
Goal:
Testing stability on downstream 17.1 SR-IOV OVN setup with the script solution proposed to customer in ticket:
https://issues.redhat.com/browse/OSPRH-19225
Acceptance Criteria:
- Create described related resources in ticket, verify failure before script, run script, verify connectivity restored after script run.
- relates to
-
OSPRH-19225 [17.1] N/S SRIOV routing on VLAN Tenant networks with ML2/OVN
-
- Verified
-