Implement periodic jobs to test upgrade feature (delivered on v0.3).
The tests must cover all the OCP versions and topologies, with OPCT features we currently support:
- OCP Versions: 4.9, 4.10, 4.11, 4.12
- OCP Topologies: HA
- OPCT features: regular/default, upgrade
Nice to have:
- Cards created to automate that task. Example of wip used on v0.2[2]
ACCEPTANCE CRITERIA
- CI jobs for upgrade feature
- blocks
-
OPCT-14 [docs] Document the steps to investigate regressions post-release
- To Do
-
OPCT-204 [CI] Create CI periodic jobs for disconnected validations
- To Do
- is blocked by
-
OPCT-71 [CI] Make jobs use latest release of OPCT instead of latest master/main code
- Closed
- is related to
-
OPCT-203 [CI] collect insights from the CI periodic jobs
- To Do
- links to
(3 links to)
There are no Sub-Tasks for this issue.