-
Bug
-
Resolution: Done
-
Critical
-
None
The Migration Guide should have a content about migrating a large managed domain gradually. Imagine a domain with 100s of hosts – there's no way to do a big-bang-style migration. Of course EAP 7 controller can manage EAP 6 hosts, so gradual migration should be possible, but we should describe it in detail.
- is cloned by
-
JBEAP-11071 [7.1] Migration Guide: gradual migration of a large managed domain
- Closed
- is related to
-
JBEAP-11431 [7.1] Migration - Update JBoss Server Migration Tool info when it is GA
- Closed
- relates to
-
JBEAP-7753 [7.1] Migration Guide: fix the supported migration paths of migration tool
- Closed
-
JBEAP-11058 [7.0] Migration Guide: fix the supported migration paths of migration tool
- Closed
-
JBEAP-2758 Migration Guide: document best practices, managed domain, performance implications, ...
- Closed