Uploaded image for project: 'Application Server 3  4  5 and 6'
  1. Application Server 3 4 5 and 6
  2. JBAS-4819 TECH REVIEW: Installation Guide - TRACKER
  3. JBAS-4820

TECH REVIEW: Installation Guide - Chapter 2 - Installation Alternatives

XMLWordPrintable

    • Icon: Sub-task Sub-task
    • Resolution: Done
    • Icon: Major Major
    • None
    • JBossAS-4.2.2.GA
    • Documentation
    • None
    • Documentation (Ref Guide, User Guide, etc.)
    • Low

      Attached is an Open Office 2.0 Document contain Chapter 2 of the Installation Guide.

      1. Open document in Open Office
      2. Edit -> Changes -> Record
      3. Edit the document
      4. Save changes and reattach to this Jira

      It is important for track changes to be enabled so the re-write can be easily performed.

      http://labs.jboss.com/jbossas/docs/Installation_Guide/beta422/html/ch02.html

              skoussou Stelios Koussouris (Inactive)
              michaelhideo_jira Michael Hideo Smith (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

                Created:
                Updated:
                Resolved: