-
Bug
-
Resolution: Done
-
Major
-
None
Currently the Conversion Task job result shows the pre-conversion analysis report even when the conversion has succeeded.
The pre-conversion report messages are irrelevant after the conversion though. They state things that are no longer true (e.g. the warning about outdated packages on the image below - the packages have been replaced with the latest version available in RHEL repos during the conversion).
Acceptance criteria:
- The pre-conversion analysis report is not shown when the conversion succeeds (convert2rhel returns 0)