[Spring Boot 2.2.6.SP2] Release steps CR [23 Sep 2020]

XMLWordPrintable

    • Icon: Task Task
    • Resolution: Done
    • Icon: Major Major
    • 2.2.6 SP2 GA
    • 2.2.6 SP1 GA
    • None
    • None

      RCM ticket: https://projects.engineering.redhat.com/browse/SPMM-2519

       

      This is a set of tasks to be completed by the CR date defined in the Summary minus the days indicated in the individual task. Some task need to be completed prior other tasks, please see the dependency graph for the details [1]. If in doubt do not hesitate to ping Jiri Pallich - PgM - for questions. Once this JIRA has been cloned for a specific release, please update the release spreadsheet [2] with the corresponding JIRA.

      [1] https://docs.google.com/drawings/d/1t4Al1MNPdC8nZzaPjlqzQxztSXd9L7zDXbsxRdPNAk4/edit
      [2] https://docs.google.com/spreadsheets/d/1mwx0x_y64H1oCiejW0o9Q19-Htsi8lKT6ZV0Rvz_bRU/edit#gid=0

       

        There are no Sub-Tasks for this issue.

            rhn-engineering-jpallich Jiri Pallich
            antcosta Antonio Costa
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: