-
Task
-
Resolution: Done
-
Major
-
2.2.6 SP1 GA
-
None
-
None
RCM ticket:Â https://projects.engineering.redhat.com/browse/SPMM-2519
Â
This is a set of tasks to be completed by the CR date defined in the Summary minus the days indicated in the individual task. Some task need to be completed prior other tasks, please see the dependency graph for the details [1]. If in doubt do not hesitate to ping Jiri Pallich - PgM - for questions. Once this JIRA has been cloned for a specific release, please update the release spreadsheet [2] with the corresponding JIRA.
[1] https://docs.google.com/drawings/d/1t4Al1MNPdC8nZzaPjlqzQxztSXd9L7zDXbsxRdPNAk4/edit
[2] https://docs.google.com/spreadsheets/d/1mwx0x_y64H1oCiejW0o9Q19-Htsi8lKT6ZV0Rvz_bRU/edit#gid=0
Â
- is documented by
-
RESTEASY-2672 RESTEasy compatibility information for Spring Boot 2.3.2
- Resolved
-
JWS-1816 Tomcat compatibility information for Spring Boot 2.3.2
- Closed
-
JBEAP-18797 (7.3.z) Upgrade resteasy from 3.9.3.SP1 to 3.11.1.Final
- Closed
-
JBEAP-19156 (7.3.z) Upgrade RESTEasy from 3.11.1.Final.redhat-00001 to 3.11.2.Final.redhat-00001
- Closed
- mentioned in
-
Page Loading...