-
Task
-
Resolution: Done
-
Major
-
3.5.0.GA
-
None
-
False
-
Blocked by https://issues.redhat.com/browse/CRW-3897
-
False
-
-
Currently, we use GA version of Dev Spaces on both staging and production clusters of Developer Sandbox. In order to do the verification faster and has permanent access to the long-running, managed instance of pre-release version of the product we need to switch the staging cluster to RC (probably with the automatic approval).
- depends on
-
CRW-3897 Use `dsc` to update DevSpaces from `latest` to `next` build
- Closed
- is related to
-
CRW-4075 Replace installDevSpaces*.sh with dsc installer / can I pass a specific IIB to dsc to install a specific catalog source / Dev Spaces version?
- Resolved
- relates to
-
CRW-4348 DS 3.6.0 DevSandbox pre-rollout (staging) verification
- Closed
- mentioned on