Details
-
Task
-
Resolution: Done
-
Major
-
3.5.0.GA
-
None
-
False
-
Blocked by https://issues.redhat.com/browse/CRW-3897
-
False
Description
Currently, we use GA version of Dev Spaces on both staging and production clusters of Developer Sandbox. In order to do the verification faster and has permanent access to the long-running, managed instance of pre-release version of the product we need to switch the staging cluster to RC (probably with the automatic approval).
Attachments
Issue Links
- depends on
-
CRW-3897 Use `dsc` to update DevSpaces from `latest` to `next` build
- Closed
- is related to
-
CRW-4075 Replace installDevSpaces*.sh with dsc installer / can I pass a specific IIB to dsc to install a specific catalog source / Dev Spaces version?
- Resolved
- relates to
-
CRW-4348 DS 3.6.0 DevSandbox pre-rollout (staging) verification
- Closed
- mentioned on