-
Bug
-
Resolution: Done
-
Critical
-
3.0.0.GA
-
False
-
None
-
False
-
Release Notes
-
-
Known Issue
-
Done
-
Golang workspace is stuck in terminating state on IBM Power when build is done and then try to delete the workspace,
Need to remove the entire DS 3.0.0 to get out of the terminating state.
The error is being observed on IBM Power only while deleting the golang workspace.