0
Bare Metal team is implementing a mechanism allowing changing values in the Infrastructure CR (e.g. VIPs, Machine Networks). The implementation is tracked in https://issues.redhat.com/browse/OPNET-340.
As the implementation lives in the Cluster Network Operator (i.e. inside already existing infrastructure controller), a review of the SDN team is needed