Uploaded image for project: 'OpenShift Virtualization'
  1. OpenShift Virtualization
  2. CNV-29346

Hypershift/KubeVirt Gating Pipeline

XMLWordPrintable

    • Hypershift/KubeVirt Gating Pipeline
    • False
    • Hide

      None

      Show
      None
    • False
    • Hide

      MUST not ship a CNV bundle before it passed HCP tests
      MUST be 100% automatic

      Show
      MUST not ship a CNV bundle before it passed HCP tests MUST be 100% automatic
    • Green
    • To Do
    • 0% To Do, 0% In Progress, 100% Done
    • Hide

      2024-02-19: HCP job gating is easily achievable to maintain Errata build numbers, and Jira tickets safeguard against releasing unqualified builds....

      Show
      2024-02-19: HCP job gating is easily achievable to maintain Errata build numbers, and Jira tickets safeguard against releasing unqualified builds....
    • ---
    • ---

      Goal

      The goal of this epic is to deliver an automated pipeline that tests the latest CNV build against stable hypershift/kubevirt as delivered by the MCE (Multi Cluster Engine).

       

      The outcome is that promotion of CNV nightlies need to be gated by this pipeline to ensure that CNV does not break the hypershift/kubevirt use case.

       

      Example pipeline steps

      • prequisites
        • ocp installed with stable odf
        • latest CNV installed
      • Setup
        • install hypershift operator using MCE operator
        • create a hypershift/kubevirt guest cluster
      • Test
        • execute ocp conformance against hypershift/kubevirt guest cluster
      • Teardown
        • destroy hypershift/kubevirt guest cluster

      User Stories

      • TODO

      Non-Requirements

      • TODO

      Notes

      • Any additional details or decisions made/needed

      Owners

      Role Contact
      PM rh_pelauter@redhat.com 
      Documentation Owner TBD
      Delivery Owner (See assignee)
      Quality Engineer (See QE Assignee)

      Done Checklist

      Who What Reference
      DEV Upstream code and tests merged <link to meaningful PR or GitHub Issue>
      DEV Upstream documentation merged <link to meaningful PR or GitHub Issue>
      DEV gap doc updated <name sheet and cell>
      DEV Upgrade consideration <link to upgrade-related test or design doc>
      DEV CEE/PX summary presentation label epic with cee-training and add a <link to your support-facing preso>
      QE Test plans in Polarion <link or reference to Polarion>
      QE Automated tests merged <link or reference to automated tests>
      DOC Downstream documentation merged <link to meaningful PR>

              dkeler@redhat.com Daniel Keler
              rhn-engineering-dvossel David Vossel
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated:
                Resolved: