-
Story
-
Resolution: Duplicate
-
Normal
-
None
-
s2i-1.4
-
None
-
5
-
False
-
-
False
-
With this update, source-to-image is now available as a UBI9-based container image.
-
Feature
-
Proposed
-
-
-
1
Story (Required)
As a developer trying to use s2i to build container images I want a UBI9 based image so that I can deploy it on OpenShift 4.16+ clusters.
<Describes high level purpose and goal for this story. Answers the questions: Who is impacted, what is it and why do we need it? How does it improve the customer’s experience?>
Background (Required)
<Describes the context or background related to this story>
OCP 4.16 is based on UBI9/RHEL9. Producing UBI9 based images ensures we have full kernel level compatibility between host and container environments.
Out of scope
<Defines what is not included in this story>
- Golang 1.22
- FIPS support
- Updating tasks, build strategies to use UBI9-based image.
- Producing RHEL 10 based image.
Approach (Required)
<Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>
Create new CPE ID for rhel9 variant of source-to-imageSpun out toBUILD-1318Create new Comet repository for s2i rhel9Spun out toBUILD-1319Create rhel9 variant Containerfile for s2iSpun out toBUILD-1317Create new rhel9 component in Konflux for s2i. May also need to rename/re-onboard the rhel8 component.Spun out toBUILD-1317
Dependencies
<Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>
- Go toolset for RHEL9
Acceptance Criteria (Mandatory)
<Describe edge cases to consider when implementing the story and defining tests>
<Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>
- rhel9 variant for s2i set up in Konflux, passing EC checks.
- CPE set up and approved for rhel9 variant (needs coordination with product security)
- Comet repository set up for s2i rhel9 image.
INVEST Checklist
Dependencies identified
Blockers noted and expected delivery timelines set
Design is implementable
Acceptance criteria agreed upon
Story estimated
Legend
Unknown
Verified
Unsatisfied
Done Checklist
- Code is completed, reviewed, documented and checked in
- Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
- Continuous Delivery pipeline(s) is able to proceed with new code included
- Customer facing documentation, API docs etc. are produced/updated, reviewed and published
- Acceptance criteria are met
- is incorporated by
-
BUILD-1317 Konflux setup for s2i - RHEL9
-
- Closed
-
-
BUILD-1318 CPE ID for s2i RHEL9
-
- Closed
-
-
BUILD-1319 Comet repo for s2i RHEL9
-
- Closed
-