Uploaded image for project: 'Red Hat Advanced Cluster Management'
  1. Red Hat Advanced Cluster Management
  2. ACM-20293

[RFE] Provide a Helm chart flag to distinguish upgrade vs. fresh install

XMLWordPrintable

    • [RFE] Provide a Helm chart flag to distinguish upgrade vs. fresh install
    • Product / Portfolio Work
    • False
    • Hide

      None

      Show
      None
    • False
    • Not Selected
    • To Do
    • 0% To Do, 0% In Progress, 100% Done
    • Installer Sprint 2025-62
    • Critical

      OCP/Telco Definition of Done
      https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde
      Epic Template descriptions and documentation.
      https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit
      ACM-wide Product Requirements (Top-level Epics)
      https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit

      *<--- Cut-n-Paste the entire contents of this description into your new
      Epic --->*

      Epic Goal

      The import-controller should include a ConfigMap during MCE upgrades but skip it for fresh installs. So a flag is needed for the import-controller Helm chart to determine whether a certain resource, such as a ConfigMap, should be created or not.

      Why is this important?

      The implementation of the epic https://issues.redhat.com/browse/ACM-17217 depends on this feature.

      Scenarios

      ...

      Acceptance Criteria

      ...

      Dependencies (internal and external)

      1. ...

      Previous Work (Optional):

      1. ...

      Open questions:

      Done Checklist

      • CI - CI is running, tests are automated and merged.
      • Release Enablement <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub
        Issue>
      • DEV - Downstream build attached to advisory: <link to errata>
      • QE - Test plans in Polarion: <link or reference to Polarion>
      • QE - Automated tests merged: <link or reference to automated tests>
      • DOC - Doc issue opened with a completed template. Separate doc issue
        opened for any deprecation, removal, or any current known
        issue/troubleshooting removal from the doc, if applicable.
      • Considerations were made for Extended Update Support (EUS)

      -------------------------------------------------------------------------------------------------------
      QE Hand Off Template (fill out when moving to Review) 7/2/25:

      Summary of the Work:
      What was implemented or fixed? Include a brief description of the problem (if applicable) and how it was addressed.
      e.g., "Updated the UI to show validation errors for the form. The previous implementation did not surface backend validation issues."

      Key Areas to Verify:

      1. What functionality should QE focus on? List what was tested or what is most important to validate.
      2. Ensure the new validation messages appear for required fields
      3. Confirm the workflow still completes as expected after validation fixes
      4. Any edge cases or high-risk areas touched by the change

      Fix or Feature Availability:
      When will this be available in a build?
      Code merged on: YYYY-MM-DD
      Expected downstream build tag (if known): example-build-tag
      (Optional) Related PR(s): Link

              cwall@redhat.com Cameron Wall
              leyan@redhat.com Le Yang
              Matthew Smigielski Matthew Smigielski
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: