• False
    • Hide

      None

      Show
      None
    • False
    • Not Selected
    • XCMSTRAT-494ARO HCP (P6) - General Availability
    • 0

      • Lead Time Required30 day(s)

      • Move SLO KPI (ARM Fundamentals)

      Scope: Products with ARM RPs creating new Resource Types or changing existing ones.

      __________________________

      Move SLO KPI (ARM Fundamentals)

      OWNER: ARM Control Plane KPIs Team, ARM Core

      (APEX) Required by: GA

      (What) KPI Description:

      ​The Move SLO KPI is designed to ensure that every service has a 99% or above success rate for all the move requests sent to the resource provider that supports the resource move API, which ensure that all top-level tracked resources support move between resource groups and between subscriptions.

      (Why) Business Impact:

      The ability to move resources across Resource Groups - in the same subscription or across different subscriptions under the same AAD tenant - is one of top user voice request from Azure Control Plane resources.

      To improve the customer experience for Resource Move, ARM has introduced this KPI to ensure that we have 99% or above SLO for the resources that support resource move.

      (Logic) KPI Calculation Logic:

      If the given resource does not meet the 99% or above SLO, an action item is raised.

      (How) GETTING TO GREEN (IN SLA):

      Ensure 99% or above SLO for the resources taht support resource move.

            Unassigned Unassigned
            mayuri_gupta Mayuri Gupta
            Benjamin Vesel, James Harrington, Mayuri Gupta, Mayuri Gupta, Petr Kotas, Puneet Konghot, Spencer Amann
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: