-
Sub-task
-
Resolution: Done
-
Major
-
None
-
None
-
None
-
None
-
None
-
False
-
-
False
-
None
-
None
-
None
-
None
-
None
Description:
Validate and refine the node pool management foundation in a real OpenShift cluster. Ensure core functions (allocation, release, stats) are correct, edge cases are handled, and integrate with setBYOH().
Acceptance Criteria:
- Verification script runs successfully on OpenShift (all tests pass).
- Node allocation, release, and status updates are correct.
- Implement concurrent allocation protection.
- Handle edge cases (empty pool, malformed ConfigMap, missing ConfigMap).
- Code quality improvements (follow conventions, clear error messages, good logging).
Phase 1. Run verification script on real cluster
Set up access, verify WMCO, run script, fix issues.
Status: COMPLETE
- ✅ Cluster accessed (weinliu-5670, AWS)
- ✅ WMCO verified (1/1 Ready)
- ✅ ConfigMap validated (2 BYOH nodes)
- ✅ Nodes verified (Ready, 4+ hours stable)
- ✅ All acceptance criteria met
Phase2. Implement concurrent allocation protection
Add locking mechanism to prevent concurrent allocation of the same node.
Status: COMPLETE
- ✅ Optimistic locking implemented using Kubernetes ResourceVersion
- ✅ Concurrent modification detection working
- Test verified: ResourceVersion changed (191051 → 206192)
- Retry logic on conflict: 5 attempts with 500ms delay
- ✅ Race condition protection verified
- ✅ Function implemented: updateNodePoolEntryWithResourceVersion()
- ✅ Test passed: "Simulate concurrent modification" scenario
Phase3. Add comprehensive error handling
Handle edge cases like empty pool, malformed data, missing ConfigMap.
Status: COMPLETE
- ✅ All 10 edge cases tested and passing (100% pass rate)
Edge Cases Covered:
1. ✅ Missing ConfigMap - Returns error, allows fallback
2. ✅ Empty ConfigMap - Detected correctly
3. ✅ Malformed node entry - Graceful handling
4. ✅ No available nodes - Enables fallback to MachineSet
5. ✅ Platform mismatch - Platform filtering works
6. ✅ Concurrent modification - Conflict detected and retried
7. ✅ Missing required fields - Handled gracefully
8. ✅ Large node pool - Tested with 51 nodes
9. ✅ Special characters in addresses - DNS/IP both supported
10. ✅ Invalid status transitions - All validated
Phase4. Code review and quality improvements
Review code for project standards and improve where needed.
Status: COMPLETE
- ✅ Code compilation - make build successful
- ✅ Go conventions - Proper formatting
- ✅ Function documentation - All documented
- ✅ No breaking changes - Fully backward compatible
- ✅ Code integration - All 362 lines have callers
Deliverables:
- Logs/screenshots of successful test runs.
- Bug fixes and code updates.
- Updated documentation on error scenarios.