Details
-
Bug
-
Resolution: Done
-
Blocker
-
None
-
None
Description
After successful configuration and build, the QS cannot be deployed using deploy-domain.cli script. It ends with:
The batch failed with the following error (you are remaining in the batch editing mode to have a chance to correct the error): WFLYDC0022: Operation failed or was rolled back on all servers.
Errors logged in server log:
[Server:app-twoB] 09:43:23,441 ERROR [org.jboss.as.server] (ServerService Thread Pool -- 59) WFLYSRV0022: Deploy of deployment "jboss-ejb-multi-server-app-two.ear" was rolled back with no failure message [Server:app-main] 09:43:23,441 ERROR [org.jboss.as.server] (ServerService Thread Pool -- 68) WFLYSRV0022: Deploy of deployment "jboss-ejb-multi-server-app-main.ear" was rolled back with no failure message [Server:app-twoA] 09:43:23,439 ERROR [org.jboss.as.server] (ServerService Thread Pool -- 59) WFLYSRV0022: Deploy of deployment "jboss-ejb-multi-server-app-two.ear" was rolled back with no failure message
This worked fine in ER3. JBEAP-2831 blocked testing in ER4.
Attachments
Issue Links
- blocks
-
JBEAP-3292 Cannot deploy ejb-multi-server QS
-
- Closed
-
- clones
-
JBEAP-3292 Cannot deploy ejb-multi-server QS
-
- Closed
-