Uploaded image for project: 'Virtualization Strategy'
  1. Virtualization Strategy
  2. VIRTSTRAT-13

Release MTV fast - every week, every z-stream

XMLWordPrintable

    • Icon: Feature Feature
    • Resolution: Done
    • Icon: Critical Critical
    • None
    • None
    • 2025 OKR
    • Product / Portfolio Work
    • False
    • Hide

      None

      Show
      None
    • False
    • VIRTSTRAT-35Match enterprise IT life cycle for Virtual machine Infrastructure
    • 0% To Do, 0% In Progress, 100% Done

      Goal: Deliver a z-stream within hours after the upstream change got merged.

      Scope

      • Releases without manual testing (chi/cve, zstreams, possibly)

      Sub-Goals

      • From code merge in upstream, to completed tier1 tests, and attached to errata: 4hrs
      • Run upgrade tests automatically (define what upgrade tests)

      Strategy:

      • Reduce the time required to validate a single build (build refers to a single bundle with any update in it's operands)
      • Get rid of all manual interventions when building and validating a build (fully automate the flow up to the errata for positive runs)
      • Avoid manual test case verification in z-streams
        We have CI which
      • is covering at least VMware providers
      • which is 100% of time passing (unless there are bugs)
      • testing is automatically triggered for downstream builds
      • downstream builds are attachde to errata once the pass testing
      • Merged upstream PR to attached to errata time is less than 4hrs

              fdeutsch@redhat.com Fabian Deutsch
              fdeutsch@redhat.com Fabian Deutsch
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: