Uploaded image for project: 'Teiid'
  1. Teiid
  2. TEIID-4332

Enhance costing to better guess at ndv

XMLWordPrintable

    • Icon: Quality Risk Quality Risk
    • Resolution: Done
    • Icon: Major Major
    • 9.1
    • None
    • Query Engine
    • None

      Our logic for determining ndv is mostly ad hoc and varies greatly depending upon the position in the plan. This needs to be more standardized and based upon consistent assumptions - also additional information such as predicates and foreign keys should influence the calculation.

              rhn-engineering-shawkins Steven Hawkins
              rhn-engineering-shawkins Steven Hawkins
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: