Uploaded image for project: 'Subscription Watch'
  1. Subscription Watch
  2. SWATCH-3992

Create Test Plan for tallying swatch-metrics-hbi produced events via nightly tally

XMLWordPrintable

    • Icon: Spike Spike
    • Resolution: Unresolved
    • Icon: Normal Normal
    • None
    • None
    • swatch-tally
    • None
    • 5
    • False
    • Hide

      None

      Show
      None
    • False
    • subs-swatch-thunder

      In preparation for updating the nightly tally process to tally based on events produced from HBI, we need a test plan to ensure that the results of the new/current processes achieve the same results.

      Acceptance Criteria

      • Current IQE test remain as is to cover legacy tally.
      • Any test gaps are identified and documented (both pre-existing and new gaps introduced by tally process changes)
      • Test plan should be based on migrating existing nightly tally tests over to the new test framework
        • Potential challenges, if any, are identified
      • Test plan is created by a dev/qe member to spread the knowledge.

              Unassigned Unassigned
              rhn-sqe-tmcknigh Trayvon McKnight
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: