-
Task
-
Resolution: Obsolete
-
Major
-
None
-
None
-
5
-
False
-
True
-
subs-swatch-1
-
-
After a PR merges to main all the ephemeral tests should be re-run. This ensures that if there are conflicts between two PRs and they are merged we still have a test suite that will catch the changes. It should be able to run in a very similar pipeline to the one for stage post deploy.
Acceptance Criteria
- Ephemeral tests are run after merge, this may use the same job if filters can be updated appropriately on ibutsu
- This job is created on smqe jenkins (because konflux is not ready for it given their lack of monorepo support). This is configured in the swatchci repo
- Results are reported in the Ibutsu "Post deploy health - Tekton" widget
- Two different rows for rhsm-subscriptions stage and rhsm-subscriptions EE
- mentioned on
(2 mentioned on)