[Upstream Cycle]Make FailedScheduling Event more intuitive

XMLWordPrintable

    • Make FailedScheduling Event more intuitive
    • Upstream
    • 1
    • False
    • None
    • False
    • Green
    • To Do

      Epic Goal*

      What is our purpose in implementing this?  What new capability will be available to customers?

      Improve the error message displayed when a pod is trying to attach a volume that does not match the label/selector.

      If a pod is running in a specific Availability Zone but has a Volume attached from a different Availability Zone (or even Volume from multiple Availability Zones), scheduling of the given pod fails with the below Event.

      17s         Warning   FailedScheduling         pod/hostname-6789bfb487-7m5pf      0/6 nodes are available: 1 node(s) had volume node affinity conflict, 2 node(s) didn't match Pod's node affinity/selector, 3 node(s) had untolerated taint {node-role.kubernetes.io/master: }. preemption: 0/6 nodes are available: 6 Preemption is not helpful for scheduling.

       
      Why is this important? (mandatory)

      What are the benefits to the customer or Red Hat?   Does it improve security, performance, supportability, etc?  Why is work a priority?

      Current error message is considered not explicit enough and prevent non OCP power user to easily debug such errors. This can impact OCP onboarding experience.

       
      Scenarios (mandatory) 

      Provide details for user scenarios including actions to be performed, platform specifications, and user personas.  

      1.  

       
      Dependencies (internal and external) (mandatory)

      What items must be delivered by other teams/groups to enable delivery of this epic. 

      Contributing Teams(and contacts) (mandatory) 

      Our expectation is that teams would modify the list below to fit the epic. Some epics may not need all the default groups but what is included here should accurately reflect who will be involved in delivering the epic.

      • Development - STOR
      • Documentation - NO
      • QE - STOR
      • PX - 
      • Others -

      Acceptance Criteria (optional)

      Provide some (testable) examples of how we will know if we have achieved the epic goal.  

      Drawbacks or Risk (optional)

      Reasons we should consider NOT doing this such as: limited audience for the feature, feature will be superseded by other work that is planned, resulting feature will introduce substantial administrative complexity or user confusion, etc.

      Done - Checklist (mandatory)

      The following points apply to all epics and are what the OpenShift team believes are the minimum set of criteria that epics should meet for us to consider them potentially shippable. We request that epic owners modify this list to reflect the work to be completed in order to produce something that is potentially shippable.

      • CI Testing -  Basic e2e automationTests are merged and completing successfully
      • Documentation - Content development is complete.
      • QE - Test scenarios are written and executed successfully.
      • Technical Enablement - Slides are complete (if requested by PLM)
      • Engineering Stories Merged
      • All associated work items with the Epic are closed
      • Epic status should be “Release Pending” 

              rh-ee-rhrmo Richard Hrmo
              rh-gs-gcharot Gregory Charot
              Rohit Patil Rohit Patil
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:

                  Estimated:
                  Original Estimate - 1 week
                  1w
                  Remaining:
                  0m
                  Logged:
                  Time Not Required
                  Not Specified