Uploaded image for project: 'OpenShift Storage'
  1. OpenShift Storage
  2. STOR-2265

Upstream Beta Tracking: VolumeGroupSnapshot

XMLWordPrintable

    • Upstream Beta Tracking: VolumeGroupSnapshot
    • Upstream
    • 2
    • False
    • None
    • False
    • Not Selected
    • To Do
    • OCPSTRAT-1093 - Support for VolumeGroup Snapshots (TP)
    • OCPSTRAT-1093Support for VolumeGroup Snapshots (TP)
    • 100% To Do, 0% In Progress, 0% Done

      Epic Goal

      Support upstream feature "VolumeGroupSnapshot"" in OCP as Beta GA, i.e. test it and have docs for it.

      Why is this important?

      • We get this upstream feature through Kubernetes rebase. We should ensure it works well in OCP and we have docs for it.

      Upstream links

      Acceptance Criteria

      • CI - MUST be running successfully with tests automated
      • Release Technical Enablement - Provide necessary release enablement details and documents.
      • ...

      Dependencies (internal and external)

      1. External: the feature is currently scheduled for GA in Kubernetes 1.32, i.e. OCP 4.19.

      Done Checklist

      • CI - CI is running, tests are automated and merged.
      • Release Enablement <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR or GitHub Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub Issue>
      • DEV - Downstream build attached to advisory: <link to errata>
      • QE - Test plans in Polarion: <link or reference to Polarion>
      • QE - Automated tests merged: <link or reference to automated tests>
      • DOC - Downstream documentation merged: <link to meaningful PR>

              hekumar@redhat.com Hemant Kumar
              rhn-engineering-jsafrane Jan Safranek
              Wei Duan Wei Duan
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:

                  Estimated:
                  Original Estimate - 2 weeks
                  2w
                  Remaining:
                  Remaining Estimate - 1 week
                  1w
                  Logged:
                  Time Spent - Not Specified Time Not Required
                  Not Specified