Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-8302

Ansible converter research

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Won't Do
    • Icon: Undefined Undefined
    • None
    • None
    • None
    • None
    • False
    • Hide

      None

      Show
      None
    • False

      Story (Required)

      As a developer- trying to understand better the structure of a similar tool. I want to start off my tool with the same basic infrastructure.

      build a high level diagram of the Ansible converter tool- how it is built, what tools and libraries is it using, how data is stored and being searched..

      Meet with the tool developer to better understand the components, and why was a UI developed instead of a CLI.

       

      Background (Required)

      Building a Jenkins to Tekton automated converter. 

      Approach (Required)

      research every tool mentioned in the demo recording, try to use it myself and understand what changes will I have to make.

      Dependencies

      epic- SRVKP-8293

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

              rh-ee-ngelman Naomi Gelman
              rh-ee-ngelman Naomi Gelman
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved:

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 1 minute
                  1m