Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-8102

Results performance - Scale Tekton Results horizontally

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Major Major
    • None
    • None
    • Tekton Results
    • None
    • Results performance - Scale Tekton Results horizontally
    • False
    • Hide

      None

      Show
      None
    • False
    • SRVKP-10268Allow customizations for high load deployment (horizontal scaling)
    • To Do
    • SRVKP-10268 - Allow customizations for high load deployment (horizontal scaling)
    • 75% To Do, 0% In Progress, 25% Done
    • Release Note Not Required
    • Done

      Story (Required)

      Horizontal scaling of the Tekton Results components (API and Watcher) is not easy because of two issues:

      • gRPC uses HTTP2 and long lasting connections
      • scaling Knative controllers require some extra changes - switching to StatefulSets from Deployments and properly managing number of buckets vs replicas. Some Tekton components already do that and the operator supports it, so we need to follow on that example.

       

      Background (Required)

      <Describes the context or background related to this story>

      Out of scope

      <Defines what is not included in this story>

      Approach (Required)

      <Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Mandatory)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

              Unassigned Unassigned
              rh-ee-kbaig Khurram Baig
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated: