Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-6789

StepActions with PaaC are not shown

XMLWordPrintable

    • 8
    • False
    • None
    • False

      Story (Required)

      When showing the PipelineRun task status on the SCM when a PR completed it doesn't show the steps, for example here is a pipelinerun with many StepActions but the task breakdown shows only one task but not the actual steps:

       

      here is the actual number of steps executed

       

      we should be able to show the steps, there is a limited html tags avability on github actions or other vcs which makes it hard

      Background (Required)

      <Describes the context or background related to this story>

      Out of scope

      <Defines what is not included in this story>

      Approach (Required)

      <Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Mandatory)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

        1. image-2024-11-19-12-52-53-171.png
          112 kB
          Chmouel Boudjnah
        2. image-2024-11-19-12-53-20-064.png
          165 kB
          Chmouel Boudjnah

              Unassigned Unassigned
              cboudjna@redhat.com Chmouel Boudjnah
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: