-
Story
-
Resolution: Done
-
Critical
-
None
-
1
-
False
-
None
-
False
-
-
-
8
-
Pipelines Sprint Pioneers 12, Pipelines Sprint Pioneers 13, Pipelines Sprint Pioneers 14, Pipelines Sprint Pioneers 15
Story (Required)
Console team needs below metrics to expose from PAC side
**
1. Number of PipelineRuns associated with Pipelines
- All namespaces
- Particular namespaces
- These metrics are already available
2. Maximum duration of a PipelineRuns out of total PipelineRuns
Particular namespacesPipelineRun in a namespace for a pipeline
3. Number of running PipelineRuns for particular namespace ---- Added as part of this story
4. Number of running PipelineRuns for particular namespace particular Pipeline - Added as part of this story
Background (Required)
<Describes the context or background related to this story>
Out of scope
<Defines what is not included in this story>
Approach (Required)
<Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>
Dependencies
<Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>
Acceptance Criteria (Mandatory)
<Describe edge cases to consider when implementing the story and defining tests>
<Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>
INVEST Checklist
Dependencies identified
Blockers noted and expected delivery timelines set
Design is implementable
Acceptance criteria agreed upon
Story estimated
Legend
Unknown
Verified
Unsatisfied
Done Checklist
- Code is completed, reviewed, documented and checked in
- Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
- Continuous Delivery pipeline(s) is able to proceed with new code included
- Customer facing documentation, API docs etc. are produced/updated, reviewed and published
- Acceptance criteria are met
- links to