Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-4318

Report error message to the user namespace when the tekton yaml could not apply

    XMLWordPrintable

Details

    • 3
    • False
    • None
    • False
    • Hide
      The validation errors occurring in PipelineRuns as reported by the
      tekton controller within the .tekton directory are now reported directly
      in the event logs of the user namespaces along with the pipelinerun
      name where the error has occurred, this let a user troubleshoot the issue
      even if she or he doesn't have access to the controller log.
      Show
      The validation errors occurring in PipelineRuns as reported by the tekton controller within the .tekton directory are now reported directly in the event logs of the user namespaces along with the pipelinerun name where the error has occurred, this let a user troubleshoot the issue even if she or he doesn't have access to the controller log.
    • Pipelines Sprint 259, (temp)Backlog from 260 and 259

    Description

      Story (Required)

      when the user has some pipelinerun that don't validate properly on the tekton controllers, we only report them to the controller logs (which only admins can see) and not the user namespace, it would be great as well to report which pipelinerun has the error and not just the error that can be in any pipelineruns in the .tekton directory.

      Background (Required)

      <Describes the context or background related to this story>

      Out of scope

      <Defines what is not included in this story>

      Approach (Required)

      <Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Mandatory)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      INVEST Checklist

      Dependencies identified

      Blockers noted and expected delivery timelines set

      Design is implementable

      Acceptance criteria agreed upon

      Story estimated

      Legend

      Unknown

      Verified

      Unsatisfied

      Done Checklist

      • Code is completed, reviewed, documented and checked in
      • Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      • Continuous Delivery pipeline(s) is able to proceed with new code included
      • Customer facing documentation, API docs etc. are produced/updated, reviewed and published
      • Acceptance criteria are met

      Attachments

        Activity

          People

            cboudjna@redhat.com Chmouel Boudjnah
            cboudjna@redhat.com Chmouel Boudjnah
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated: