Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-4035

[release testing] TPS tests in pre-stage and stage

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Done
    • Icon: Major Major
    • Pipelines 1.14.0
    • Pipelines 1.14.0
    • QA
    • Pipelines Sprint 258

      https://docs.google.com/document/d/1neF9N2FkOp1PfpMlzTJfRISeup9OXUbqNkQDjKF7fKY/edit#heading=h.6hgzn7k1yywi

      1. open https://tps-server.lab.bos.redhat.com/test_profiles
      2. search for "stable-pipelines-for-rhel-8"
      3. open the profile and click Edit
      4. alternativaly, open directly https://tps-server.lab.bos.redhat.com/test_profiles/799/edit
      5. check pipelines-1.XX-for-rhel-8-rpms, pipelines-1.XX-for-rhel-8-debug-rpms and pipelines-1.XX-for-rhel-8-source-rpms
      6. save changes
      7. get a Kerberos ticket kinit
      8. pre-stage: bkr workflow-tomorrow --errata=$EID --tps-rpmtest --tps-srpmtest --profile=stable-pipelines-for-rhel-8 where EID is the number of CLI Errata advisory (6 digits)
      9. stage: bkr workflow-tomorrow --errata=$EID --tps-rhnqa --profile=stable-pipelines-for-rhel-8
      10. watch Beaker job https://beaker.engineering.redhat.com/jobs/$JID where JID is job ID from the output of previous command
      11. tps-results --errata $EID --job $JID

      Note:

      If theĀ bkr command throws error, we can clone the existing job to create a new one.
      Ex: Open the job and click on the clone button and change the values.

              varadhya Veeresh Aradhya (Inactive)
              varadhya Veeresh Aradhya (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: