Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-3631

Test Openshift Pipelines 1.12.1

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Done
    • Icon: Blocker Blocker
    • Pipelines 1.12.1
    • Pipelines 1.12.1
    • QA
    • None
    • Test Openshift Pipelines 1.12.0
    • False
    • None
    • True
    • Developer Tools

      Background (Required)

      Testing story for Openshift Pipelines 1.12.0

      Acceptance Criteria (Mandatory)

      All subtasks are done

          1.
          [release testing] Operator upgrade tests Sub-task Closed Major Pavol Pitoňák
          2.
          [release testing] Cluster upgrade tests Sub-task Closed Major Veeresh Aradhya (Inactive)
          3.
          [release testing] Bug verification Sub-task Closed Major Unassigned
          4.
          [release testing] Hub manual tests Sub-task Closed Major Anton Misskii (Inactive)
          5.
          [release testing] Pipelines as Code manual tests Sub-task Closed Major Veeresh Aradhya (Inactive)
          6.
          [release testing] TKN/OPC tests Sub-task Closed Major Pavol Pitoňák
          7.
          [release testing] Devconsole UI manual tests Sub-task Closed Major Anton Misskii (Inactive)
          8.
          [release testing] Testing in disconnected env x86_64 Sub-task Closed Major Pavol Pitoňák
          9.
          [release testing] TPS tests in pre-stage and stage Sub-task Closed Major Pavol Pitoňák
          10.
          [release testing] Documentation review Sub-task Closed Major Pavol Pitoňák
          11.
          [release testing] TKN entitlement tests Sub-task Closed Major Veeresh Aradhya (Inactive)
          12.
          [release testing] FIPS testing Sub-task Closed Major Savita .
          13.
          [release testing] Multiarch testing - ARM64 Sub-task Closed Major Pavol Pitoňák
          14.
          [release testing] Multiarch testing - IBM Power Sub-task Closed Major Unassigned
          15.
          [release testing] Multiarch testing - IBM Z Sub-task Closed Major Unassigned
          16.
          [release testing] Results manual tests Sub-task Closed Major Pavol Pitoňák
          17.
          [release testing] Chains manual tests Sub-task Closed Major Pavol Pitoňák
          18.
          [release testing] Smoke test in stage Sub-task Closed Major Pavol Pitoňák
          19.
          [release testing] Verification of CLI binary SHA/signature on Mac and Windows Sub-task Closed Major Pavol Pitoňák
          20.
          [release testing] Post-release verification Sub-task Closed Major Veeresh Aradhya (Inactive)
          21.
          [release testing] HyperShift/ROSA testing Sub-task Closed Major Pavol Pitoňák
          22.
          [release-testing] Performance tests Sub-task Closed Major Veeresh Aradhya (Inactive)

              ppitonak Pavol Pitoňák
              varadhya Veeresh Aradhya (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: